JK Cement moves up on making investment in equity share capital of Mehrauni Electro Power

[ad_1] Mumbai, April 16 (Udaipur Kiran): JK Cement is currently trading at Rs. 5477.05, up by 46.00 points or 0.85% from its previous closing of Rs. 5431.05 on the BSE. The scrip opened at Rs. 5477.05 and has touched a high and low of Rs. 5477.05 and Rs. 5439.70 respectively. So far 56 shares were […]

Power Shutdown Announced in Several Udaipur Areas | Udaipur Kiran

[ad_1] Udaipur, April 16 (Udaipur Kiran): Electricity supply will remain suspended in several parts of the city on April 16 due to maintenance work on the 11 kV Youth Hostel feeder. According to the electricity department, the shutdown will be in effect from 10:30 AM to 2:00 PM. Affected Areas Power supply will remain disrupted […]

Power Cut in Several Areas of Udaipur Today 9 April | Udaipur Kiran

[ad_1] Udaipur, April 9, 2026 (Udaipur Kiran): Power supply will remain disrupted in several parts of the city on Thursday due to scheduled maintenance work. According to the notice, electricity will be shut down from 10:30 am to 12:00 pm in areas including Savina, Titardi, Roshan Ji Ki Badi, Biliya, Murshid Nagar, Barkat Colony, Sector […]

ACME Solar Holdings inches up as its arm commissions additional 4 MW wind power project in Gujarat

[ad_1] Mumbai, April 9 (Udaipur Kiran): Acme Solar Holdings is currently trading at Rs. 273.65, up by 0.10 points or 0.04% from its previous closing of Rs. 273.55 on the BSE. The scrip opened at Rs. 271.70 and has touched a high and low of Rs. 275.20 and Rs. 269.55 respectively. So far 24920 shares […]

Germany is building a 364-metre world’s tallest wind turbine in a coal mine, and it could transform renewable power | World News

[ad_1] Germany is undergoing a historic industrial transformation, symbolised by the construction of a 364-meter-high wind turbine- the world’s tallest. This is an engineering feat built in a historically mined area, which marks both a monumental shift away from fossil fuels towards creating clean, renewable energy. By building at a minimum height of 364 meters, […]

THIS nuclear battery could last 433 years and power the next era of deep space exploration |

[ad_1] Space missions depend on power systems that can function far away from sunlight and without maintenance. Solar panels struggle in deep space, where light weakens with distance. That limitation has pushed agencies to rely on nuclear-based energy sources for decades. These systems, known as radioisotope power systems, have quietly supported missions operating across the […]

Power Supply to Remain Disrupted in Udaipur Areas Today | Udaipur Kiran

[ad_1] Udaipur, March 30 (Udaipur Kiran): Power supply will remain disrupted in several areas of Udaipur today due to maintenance work at the 132 kV Zawar Mines GSS. According to officials, the electricity supply will be affected from 8:30 AM to 3:00 PM as part of scheduled maintenance. Affected Areas Tidi, Paduna, Saru, Barapal, Kaya, […]

4-Hour Power Cut in Kota Today for Maintenance Work | Udaipur Kiran

[ad_1] Kota, March 30 (Udaipur Kiran): Several areas in Kota will face scheduled power cuts today due to maintenance work on electricity lines. The shutdown has been planned by the private power company to carry out repair and upkeep of lines and transformers. Areas Affected and Timings 8:30 AM to 12:30 PM:Kalakunj area near Gumanpura, […]

Udaipur Power Cut March 27: 60+ Areas to Face 7-Hour Outage Today | Udaipur Kiran

[ad_1] Udaipur, March 27 (Udaipur Kiran): Power supply will remain suspended in more than 60 areas of the city on Friday due to scheduled maintenance work. According to the information, electricity will remain shut from 10:00 AM to 5:00 PM in the following areas: Harsh Nagar, Ratakhet, New Gulshan Nagar, Purbia Colony, Kalbelia Colony, Sisarma […]